Boomo Level – Survey cut and fill

Compare supplied existing and design elevations on complete rectangular survey grids. Name regions and phases, preserve the coordinate reference, and keep cut and fill separate rather than hiding both in a single net quantity.

Units and reference

One unit, height datum and coordinate system for every phase. Nothing is converted.

Length unit

The height system your levels refer to.

The XY system of the grid, for example a local site grid.

Phases and regions

A phase is one design or stage. Each region in it is one complete rectangular grid. Regions must not overlap; shared edges are fine. Arbitrary TIN and coordinate transformations are not supported.

P1Phase 11 region
R1Region 1No grid yet

Paste rows of x,y,existing,design or import a CSV file.

Compare two phases

Optional. Works when both phases share the same regions, grid and existing levels.

Attachment Warehouse · Optional

Attachments for this job

Finishing to design levels uses wide, smooth-edged grading buckets or a grading beam, which level soil, gravel and sand.

How it works

  1. 01

    Prepare CSV columns x,y,existing,design with dot-decimal numbers. State one coordinate/elevation unit, datum and coordinate reference for the workspace.

  2. 02

    Each region must contain every intersection of its X and Y coordinates. Name the regions; overlapping interiors within a phase are rejected, while shared edges are allowed.

  3. 03

    Review region sections and phase totals. Compare phases only on matching region identities, XY grids and existing baseline elevations.

Formula

Each rectangular cell is divided along SW–NE into two linear triangles. Clip the design-minus-existing difference at zero.

Triangle volume = area × mean vertex difference. Positive parts give fill, negative parts give cut; phases are never added together.

Load labelled example

Across a 1 × 1 m region, design-minus-existing rises linearly from −1 m to +1 m. The exact declared triangular model gives 0.25 m³ cut and 0.25 m³ fill, although the net is zero.

Terms

Delivered in NOK

Norway

    Delivered to Germany

    Germany

      We also deliver to

      Austria, Belgium, Bulgaria, Croatia, Czechia, Finland, France, Greece, Hungary, Italy, Luxembourg, Netherlands, Poland, Portugal, Romania, Slovakia and Spain

      Back to the shop

      Keep exploring the range. Compare specifications and prices, and check each product for availability and lead time.